CHAPTER
3
Installation:
7
CHAPTER 3
INSTALLATION
PLUMBING COMPONENTS
FIGURE 1. Conventional Spray Boom Configuration
FIGURE 2. Conventional Spray Boom Configuration with Injection
MOUNT THE SIDEKICK PRO™ ICD INJECTION SYSTEM
Refer to the “Mount the Sidekick Pro ICD Pump and Chemical Tank” section in the Sidekick Pro™ ICD Installation &
Operation Manual (P/N 016-0171-605).
• Make sure that there are no moving parts near the injection pump. This can cause damage.
• Mount the Sidekick Pro™ ICD pump as close as possible to the selected point of injection.
• Mount the Sidekick Pro™ ICD pump so that the outlet port is pointing up.