Chapter 5
40
AccuFlow™ and AccuFlow HP™ Installation & Operation Manual
Mounting the Manifold
The following figure illustrates the various methods of connecting the existing NH
3
manifold(s) (manifold not
included with AccuFlow system). When installing a manifold, Raven recommends the following:
•
Attach a 0-60 PSI gauge in one outlet of each NH
3
manifold connected to the AccuFlow system.
•
Verify that all manifold(s) hose barbs are the same orifice diameter.
•
Verify all hoses from the flow divider are the same length.
•
Verify all hoses to the manifolds are the same length.
FIGURE 9.
Manifold Mounting Examples (Single Section Tool Bar)
Note:
If more than two manifolds will be used with the AccuFlow™ system, a flow divider manifold will be
required. Follow the manifold manufacturer instructions for proper orientation and installation.
Summary of Contents for AccuFlow
Page 1: ...AccuFlow HP Patent Pending AccuFlow and AccuFlow HP Installation Operation Manual ...
Page 14: ...Chapter 2 10 AccuFlow and AccuFlow HP Installation Operation Manual ...
Page 28: ...Chapter 3 24 AccuFlow and AccuFlow HP Installation Operation Manual ...
Page 68: ...Chapter 8 64 AccuFlow and AccuFlow HP Installation Operation Manual ...
Page 86: ...Index 82 AccuFlow and AccuFlow HP Installation Operation Manual ...
Page 89: ......