
Chapter 5
32
AccuFlow™ and AccuFlow HP™ Installation & Operation Manual
Mounting the AccuFlow HP™ System
Use u-bolts and other hardware to securely mount the AccuFlow HP system directly to the frame of the tool bar
or implement. The intake ports of the AccuFlow super coolers should be pointing toward the rear of implement
and nurse tank. Take care to mount the AccuFlow assembly so that the system does not interfere with
implement folding operations.
FIGURE 1.
Typical AccuFlow HP System (Single Section, Two Valves)
Note:
AccuFlow HP systems with a fast control valve (P/N 063-0173-204) will only have a single control
valve in place of the control valve and master on/off Valve as shown in the diagram above.
Summary of Contents for AccuFlow
Page 1: ...AccuFlow HP Patent Pending AccuFlow and AccuFlow HP Installation Operation Manual ...
Page 14: ...Chapter 2 10 AccuFlow and AccuFlow HP Installation Operation Manual ...
Page 28: ...Chapter 3 24 AccuFlow and AccuFlow HP Installation Operation Manual ...
Page 68: ...Chapter 8 64 AccuFlow and AccuFlow HP Installation Operation Manual ...
Page 86: ...Index 82 AccuFlow and AccuFlow HP Installation Operation Manual ...
Page 89: ......