background image

3

NOTE:

1.

  Poles are not supplied (purchase locally to above specifications) and must be field drilled 5/8” diameter

   for M10 #3 rebar, drilled 5.55 mm 

  (.218”) for 1/4-20 self tapping grounding screw and galvanized or painted for protection. 

2.

  Pole and foundation design based on the following criteria:

 

a.

  Uniform building code Exposure B or C wind loading.

 

b.

  Vertical soil pressure of 13790 kPa (2000 pounds per square foot). 

 

c.

  Lateral soil pressure of 2758 kPa (400 pounds per square foot). 

 

d.

  Concrete compressive strength of 17.2 MPa (2500 pounds per square inch)  in 28 days.

3.

  See page 6 for grounding recommendations.

CAUTION:

  The foundation design shown does not represent an appropriate design for any specific locality. Soil conditions vary and may 

not meet design criteria given in Note 2. Consult a local professional engineer to determine your soil conditions and appropriate foundation.

ASSEMBLY AND INSTALLATION

Installing Az/El Cap Mount Onto Pole

The az/el cap is factory pre assembled. No assembly is required. Before installing az/el cap onto pole, installation mount should be in place. 

Loosen (3) az/el locking nuts on pipe clamp. Install az/el cap onto pole. If using 2 7/8” ground pole, ensure that the inner sleeve is inserted 

and that the open side is aligned with the open side of the pipe clamp (see Bottom View). If using 3.00” ground pole, remove inner sleeve on 

pipe clamp and discard it. Position the az/el cap in approximate azimuth setting and equally tighten (3) clamp nuts so that cap is held

stationary on pole, but can be swiveled with slight pressure. Tighten to approximately 2.7 N-m (2 ft-lb ).

Back View 

Square Nut (Factory Preset)

Square Nut

(Factory Preset)

Azimuth 

Locking 

Hex Nut

Bottom View

Azimuth 

Locking 

Hex Nut

Azimuth 

Locking 

Hex Nut

Open 

Side of 

Inner 

Sleeve

Open 

Side 

of Pipe 

Clamp

Detail of Pipe Clamp 

and Inner Sleeve

Note:

 

Pipe Clamp and 

Inner Sleeve Should 

be Aligned as Shown

Hex 

Clamp Nut

(3 Places)

Summary of Contents for 122 1.2 Meter

Page 1: ...025 01 Rev C RavenSkyware 1315 Industrial Park Drive Smithfield NC 27577 Telephone 1 919 934 9711 Internet www raven co uk Assembly Instructions Type 122 1 2 Meter Class I Antenna System with Precision Az El Cap Mount 8001025 01 ...

Page 2: ...indy days is extremely dangerous and must never be attempted Due to the surface area of the reflector even slight winds create strong forces For example this antenna facing a wind of 32 km h 20 mph can undergo forces of 269 N 60 lb BE PREPARED TO SAFELY HANDLE THESE FORCES AT UNEXPECTED MOMENTS ATTEMPTING TO ASSEMBLE MOVE OR MOUNT A DISH ON WINDY DAYS COULD RESULT IN DEATH OR SERIOUS INJURY Raven ...

Page 3: ...and installation procedure A suggested foundation design with conditions noted is included in this manual for reference purposes only GROUND POLE INSTALLATION 7 3 cm or 7 6 cm 2 88 or 3 00 O D 91 4 cm max 36 182 9 cm 72 102 cm 40 3 rebar x diameter of pier Insert through hole in tube and center 3 R e b a r D Minimum Diameter 25 mm to 51 mm 1 to 2 slope for water run off Grade Below Frost Line 182 ...

Page 4: ...appropriate foundation ASSEMBLY AND INSTALLATION Installing Az El Cap Mount Onto Pole The az el cap is factory pre assembled No assembly is required Before installing az el cap onto pole installation mount should be in place Loosen 3 az el locking nuts on pipe clamp Install az el cap onto pole If using 2 7 8 ground pole ensure that the inner sleeve is inserted and that the open side is aligned wit...

Page 5: ... Values in chart must be adjusted for magnetic deviation for your location for correct compass reading Rotate the reflector and az el mount on the pipe pointing it to the compass reading for your location and satellite Sweep in azimuth for signal If desired signal is not located increase or decrease elevation setting and repeat the azimuth sweep Tighten progressively 1 8 turn each all three pipe c...

Page 6: ... penetrating roof mount Installation mount and associated hardware are not supplied Ground Wire Secure Clamp Grounding Rod Ground Wire NEC Section 810 20 Ground Block NEC Section 810 20 Coaxial Cables To IDU Coaxial Cables From ODU Note Ground wire secure clamp grounding rod coaxial cables and ground block are not supplied IMPORTANT All antenna sytems must be properly grounded Refer to NEC Nationa...

Page 7: ...943 405 299 3455 2 553 60 77 3 051 686 4 381 985 315 232 2883 2 130 70 87 2 291 515 3 390 762 241 178 2585 1 910 6 1 2 m Antenna Survival Wind Loads at 125 mph Velocity M T MO based on 945 mm 37 2 in from mounting surface of center line of antenna Values shown represent maximum forces for any wind direction and include 1 5 FS Height and exposure factors from uniform building code are NOT included ...

Page 8: ...ATOR FEED ROTATION Facing Antenna For Polarization Rotate Counter Clockwise For Polarization Rotate Clockwise Antenna Polarization Chart Sign Values or Northern Hemisphere Southern Hemisphere Antenna Site West of Satellite Longitude Antenna Site East of Satellite Longitude Feed ...

Page 9: ...Determine the difference between your site longitude and the satellite longitude n Find you latitude on horizontal axis n Follow your latitude up until you intersect the curve for your n Read Elevation value on vertical axis ELEVATION IN DEGREES ...

Page 10: ...ATELLITE LONGITUDE EARTH STATION ANTENNA AZIMUTH IN DEGREES EARTH STATION ANTENNA AZIMUTH IN DEGREES EARTH STATION ANTENNA LATITUDE IN DEGREES NORTH OR SOUTH OF EQUATOR AZIMUTH COLUMN READING WHEN EARTH STATION IS WEST OF SATELLITE AZIMUTH COLUMN READING WHEN EARTH STATION IS EAST OF SATELLITE AZIMUTH CHART ...