Use and maintenance manual RBV 7006 - RBV 7008
Page 51
Rev.0 09-07-19
EN
SHIPPING AND INSTALLATION
Safety warnings for transportation and installation
! IMPORTANT
The stove must be installed by a qualified technician, who must issue a declaration of
conformity of the system to the purchaser, taking full responsibility for stove installation
and correct operation.
! IMPORTANT
The stove installation site must be chosen so that the generated heat can spread evenly
throughout the rooms that you wish to heat.
The stove needs to be connected to a single chimney that guarantees the draught declared by the Manufacturer
and observes the installation regulations that apply to the installation site.
The room where the stove is installed must have an air intake.
The air vent must be installed in such a way that it can not be blocked.
The Manufacturer will not be held liable for installation that is not compliant with the laws in force, incorrect air circulation in the rooms
and inappropriate use of the appliance.
In particular, it is necessary:
•
that the appliance be connected to a smoke evacuation system duly sized to guarantee the draught declared by the Manufacturer,
that is tight and observes the distances from flammable materials;
•
that there is a suitable combustion air intake in compliance with the type of installed product;
•
that other installed combustion appliances or devices do not create a vacuum in the room where the stove is installed;
•
that the safety distances from flammable materials are observed.
Verification of system compatibility has a priority over any other assembly or installation operation.
! IMPORTANT
Local administrative regulations and particular requirements of the authorities pertaining
to the installation of combustion appliances, the air intake and the smoke evacuation
system, may vary based on region or nation. Check with your local authorities if there are
stricter laws than set forth herein.
Packaging
When the stove arrives, check:
•
that it is the model you ordered;
•
that it has not been damaged during shipping.
Any complaints must be reported to the deliveryman (also on the delivery note) upon receival.
Check the capacity of the floor before handling and positioning the stove.
To handle the stove in its packaging, follow the procedure below:
1
Position the pallet truck forks in the slots under the wooden pallet.
2
Lift slowly.
3
Place the stove near the chosen location for installation.
The stove always needs to be handled vertically. Take extra care to protect the door and its glass against
mechanical impact that could jeopardise their integrity
.
To unpack the stove, follow the procedure described below:
1
Cut the straps and remove the wooden reinforcement frame resting on the box
2
Slowly lift the cardboard box
3
Remove any bubble-wrap or similar
4
Remove the stove from the pallet and position the appliance in the chosen location, ensuring that it is compliant with
the directions.
! IMPORTANT
The end user is responsible for disposing of the packaging in accordance with the laws in
force in the country of installation.
Set-ups for the smoke evacuation system