Use and maintenance manual R 1000 Pro
Pag.34
Rev.0 18/04/2023
EN
Testing and commissioning
Stove start-up must be preceded by testing, which includes an operational check of the following elements:
•
connection to the smoke evacuation system;
•
electrical connections;
•
operation of any connected external probes;
•
checking that all materials used to build the smoke duct, chimney and chimney pot are regulation and suitable for use.
The testing is positive only when all operational phases have been completed without any anomaly being detected.
Electric scheme R 1000 Pro
F N
FUMI
SCAM.
COC.
ACC.
AL2 AL1
N
V2\PO
AL3
AUX2
-TC1+
TERM
N.AMB
N.H2O
N.PEL.
BLU
GND
+5V
ENC
AUX1
CN2
ENCODER
DISPLAY
FLUE GAS EXTRACTOR
ROOM PROBE
FLUE GAS PROBE
T.EXT.
Pressure
switch
Summary of Contents for R 1000 Pro
Page 1: ...USE AND MAINTENANCE MANUAL R 1000 Pro...
Page 2: ......
Page 4: ......
Page 30: ...Use and maintenance manual R 1000 Pro Pag 30 Rev 0 18 04 2023 EN Lower frame assembly x4 1 2...
Page 54: ......
Page 55: ......