When installing the R-box into plasterboard, use a mounting frame.
Open the water supply
valve to check whether any
leaking from any connection
parts.
Remove the cover plate from the
embedded unit and remove the
2 blanks on the water outlet in
accordance with fig.
Remove the two sealing rubber
plugs from the body. Then
re-install the sealing board with
the Allen key.
Open the hot and cold water shut-off
valves to flush the pipes and clean
them of sand and other small-
grained dirt. Check that water flows
out of all connected outlets.
Glue the plaster guard around
the protruding R-box to protect
the wall around the R-box.
Make sure no leaking after
the test mentioned above, then
seal the R-box and the water
pipe with cement.
Important: make sure the protruding
portion of the R-box is directly
perpendicular to the wall surface. This
is required in order for the covering
plate to be installed correctly.
Sealing wall
Testing procedure
Connect the inlets of hot and
could water pipes as well
as other function water pipes
to the R-box, tighten with wrench.
2
3
90°
Summary of Contents for R-box Multi RB 071.50
Page 31: ...2 3 R box R BOX C 2 R box R box R box R box 90...
Page 32: ...Off CR 067 00 RB 071 50 R box CR 067 00 R box R box R box Multi RAVAK a s...
Page 38: ...180 240 Max 105 mm Min 85 mm 0 05 1 0 65 C 180 240 R BOX 85 105 R box 4 R box 4 R box 1 2 3 1...
Page 39: ...R box R BOX 2 R box R box R box R box 2 3 90...
Page 40: ...R box CR 067 00 R box R box R box R box Multi RAVAK a s Off CR 067 00 RB 071 50...