Page 3
Installation
Installation:
1. Using the supplied spanner bit, remove the 4 screws holding the front cover in place and then remove the cover.
2. Using a drill bit or knockout set, drill two holes in the bottom of the enclosure large enough for the water tight
connector.
3. Turn over the back of the enclosure and screw 1 mounting foot onto each mounting hole using the supplied
screws.
4. Run telephone line in conduit, bring line into the enclosure through the water tight connector, and tighten conduit
to connector.
5. Connect the incoming line to the RJ11 connector and plug it into the RJ11 jack on the board. Or, obtain a biscuit
jack, terminate your incoming line to the biscuit jack, and plug the included phone line into the RJ11 connector on
the biscuit jack.
Note:
Do not cut RJ11 jack of supplied line cord and splice phone line onto it.
6. Run 120vac into the other conduit and water tight connector. Connect 120vac to the supplied transformer in the
enclosure using proper wire nuts. Black is hot and white is neutral (see page 4 for a more detailed wiring diagram).
Note:
The transformer is wrapped separately in the box.
7. Locate the green battery backup pack in the enclosure. Plug the white connector located on the battery pack into
the “BATTERY” connector in the bottom left corner of the yellow board.
8. Turn on the electrical power.
9. After following programming instructions on page 4-5, screw cover back into place. Unit is ready for testing.
Items Needed:
• Live phone line
• 120vac power
• Drill
• Drill bit or knockout set
• Biscuit jack
• Mounting screws
• #10 spanner bit (provided)
• Conduit with (2) water tight connectors
• Screwdriver
• Wire nuts
• Mounting feet (provided)