SECTION 7: R
OOF
15
FIGURE 5: Roof Curb Assembly
NOTE:
*Blo
w
er and B
u
rner Section
**Blo
w
er, B
u
rner and Mixbox
*** Split sides and Cross Brace for Model 2030
• C
u
rb is shipped
u
nassembled.
• A and B are o
u
tside dimensions for the top of the c
u
rb.
• C
u
rb material is 14 ga
u
ge gal
v
anized steel.
• N
u
ts and bolts (3/8" x 1") are f
u
rnished.
• Ca
u
lk all joints before assembling. (Ca
u
lk pro
v
ided by others)
Caulk required for outside perimeter
of roof curb at bolted joints.
Top Mounting Flange
Side Panel
End Panel
(Inlet or Discharge)
***Side panels are split
***Cross Brace
Model
Dimensions
Wei
g
ht*
Wei
g
ht**
A
B
C
D
E
lbs
k
g
lbs
k
g
2005
(in)
25.9
78.2
22.9
131.7
53.5
96
43
140
63
(cm)
65.8
198.6
58.2
334.5
135.9
2010
(in)
39.3
102.5
36.3
155.5
51.4
133
60
179
81
(cm)
99.8
260.3
96.8
395.1
128.1
2010B
(in)
47
93
42.1
143.2
47.9
130
59
173
78
(cm)
119.4
236.2
111.6
363.8
119.2
2020
(in)
53.5
113.6
48.9
183
69
153
69
216
97
(cm)
135.9
288.5
128.8
464.8
175.3
2030
(in)
76.6
151.8
73.1
215.4
64.6
210
94
268
121
(cm)
194.6
385.6
190.3
547.1
161.5