
GB-6
ZT 220D
Series
ASSEMBLY AND SETUP
7.
TRACTION LEVERS
a) Loosen bolt
A
and remove bolt
B
.
b) Rotate traction lever
D
into position and secure
with bolts
A
and
B
. Repeat for the other lever.
c) Tighten all fasteners.
d) Sit on the machine. Levers may be adjusted in
bracket
C
for a more comfortable reach, or
moved to upper set of holes for a better operator
fit.
8.
DECK LEVELING
a) Park the machine on a smooth, level surface.
Raise the deck to the transport position.
b) Lower the deck onto a set of equal height blocks
A
under the rear corners of the deck. Place
another set of blocks
B
under the front of the
deck so that the deck top is pitched forward 1/8”.
NOTE:
The front and rear of the deck are at different
heights.
c) Measure the height of the blade cutting edge
above the ground. Remove pin
C
and set the
height of cut lever
D
to that height
d) Loosen the jam nuts on the height of cut clips
and adjusting screws
E
. Turn the adjusting
screws
E
until the play is taken out of the chains
at all four corners. Tighten the jam nuts against
the clips and at the adjusting screws.
Summary of Contents for ZT220D
Page 59: ......