en-65
OPERATION 6
SLOPE CALCULATION CHART
Use Either of these columns but not both
The result of what you are measuring
Height ‘C’ in inches
measured with a 1 yard
horizontal edge ‘A’
Height ‘C’ in millime
-
ters measured with a 1
metre horizontal edge
‘A’
Slope Angle ‘D’
measured in
Degrees
Slope Angle ‘D’
measured in
Grade%
3
4.8
8.3
100
5.7
10.0
150
8.5
15.0
6
9.5
16.7
200
11.3
20.0
7.5
11.8
20.8
225
12.7
22.5
9
250
14.0
25.0
275
15.4
27.5
10
15.5
27.8
300
16.7
30.0
11
17.0
30.6
325
18.0
32.5
12
18.4
33.3
350
19.3
35.0
13
19.9
36.1
375
20.6
37.5
14
21.3
38.9
400
21.8
40.0
15
22.6
41.7
425
23.0
42.5
16
24.0
44.4
475
25.4
47.5
18
500
26.6
50.0
20
29.1
55.6
600
31.0
60.0
25
34.8
69.4
800
38.7
80.0
30
39.8
83.3
900
42.0
90.0
36
1000
45.0
100.0
Summary of Contents for MP653
Page 8: ...en 6 2 INTRODUCTION NOTES ...
Page 54: ...en 52 5 CONTROLS NOTES ...
Page 85: ...en 81 ADJUSTMENTS 7 NOTES ...
Page 87: ...en 83 MAINTENANCE AND LUBRICATION 8 B B A A B B B A A B ...
Page 113: ...en 109 MAINTENANCE AND LUBRICATION 8 NOTES ...
Page 123: ...en 119 QUALITY OF CUT 10 NOTES ...
Page 126: ...en 122 11 FUSES RELAYS AND CONTROLLER NOTES ...
Page 129: ...en 127 SPECIFICATIONS 12 A B E D L C K H M J ...