.
2
3
Chapter
Four
:
Transportation
and
parking
Before
transport
ing
the
machines,
please
pay attention to the
main
specifications
and
dimension
s.
C
heck
overall
weight,
length,
width,
height,
travel
speed
,
ground
pressure
,
etc.
Please
check
the
road
width,
bridges
and
road
situation,
and
the
traffic
situation
before
transportation.
If
related
to
regulations
of
the
road
traffic,
machinery
or
tools
transportation,
please
obtain
prior
approval
from
the
relevant
authorities.
●Up and down the flatbed
Warning!
Please
drive
slowly
when going
up
and
down
t
he
flatbed
trailer
!
Don’t
use
working
equipments
from
top
to
bottom
of
the
flatbed,
otherwise
it
m
ay
cause
an
accident.
Don’t
use
other
joysticks
except
the
travel
rod
on
the
slope.
Pay
special
attention
to
the
barycenter
of
the
machine
up
and
down
the
slope
in
order
to
avoid
sudden
change
of
focus.
1.
The
machine
should
be
loaded onto
the
flatbed
on
the
flat
ground.
2.
Use
the
sufficient
length,
width,
intensity
and
inclination
to
connect
ramps.
Use
the
non-slip-like
ramps
on a
rainy
day.
3. Please
check
if
the
machine
and
the
bridge
deck
are
in
the
same
line
before
going
up
to
the
deck.
Basically,
the
travel
motor
is
back
when
driving
up
to
the
flatbed,
motor
is in
front
when
going
down
to
the
flatbed.
4. Please
le
ad with
the
front
first
if
with
the
working
equipment
and
the
back
first
if
without
Transportation on the road