.
1
4
●Notes
of operation on a
slope
Please
pay
special
attention
to
the
operation
on
a
slope
because
of
its
lack of
balance.
You must
travel
vertically
,
not
horizontally
.
Please
do not
swing
the arm when
the
bucket
is
full
of
material
.
I
f
you must
do
that,
make
sure
you are on a flat, sturdy,
working
platform
.
●Notes
of
operation
under
the
electric
wir
ing above
.
It
may
cause
serious
injuries
if
the
machine
or
the
arm
touch
the
wire.
P
lease
keep
enough
distance
from
the
machine
to
the
wires above while
working
.
The
minimum
distance
standard
s are
as
follows:
Voltage(V) Target
Standard
Distance
Under100·200
Above
6.5ft
Under 6.600
Above
6.5ft
Under 22.000
Above
10ft
Under 66.000
Above
13ft
Under154.000
Above
16ft
Under275.000
Above
22ft
Under500.000
Above
36ft