For technical support, contact us at 1-800-565-5321
1505-FTL Installation Guide
| REV. B1 | Page
3
PHASE 1 –
ASSEMBLY
1.1 SETUP
1.1.1
Unpack components; compare with the bill of materials.
1.1.2
Verify all parts are present.
Item No.
Description
Qty.
10-702
Mounting Track
2
10-4440
“C” Foot
4
15-0503
Front Crossbar
1
15-0513
Rear Crossbar
1
94-1008
Assembly Fastener Kit
1
96-1004
Install Fastener Kit
1
BILL OF MATERIALS
10-702
15-0513
15-0503
10-4440