STEP 4
( Locating Power Unit )
1. Select a site for the power unit so that operators
have a full unobstructed view of the lift.
2. It is recommended that the hydraulic hose and air
safety line for the lift be routed through the floor at the
base of the power unit, so check for routing clearances.
3. Using the motor stand as a template, mark the
locations of the two anchor bolt holes.
4. Drill two holes 3/4” x 4” deep in concrete floor.
5. Remove all dust from hole.
6. Install anchors as shown below.. (See Fig. 4.2)
7. Secure stand to floor using two 3/4” anchor bolts
supplied.
8. Attach power unit to stand using four 5/16” hex bolts
and nylok nuts supplied. NOTE: Motor must be at least
18” above floor.
9. Install the air saftey valve “Z ”bracket on the upper
left mounting hole of the power unit bracket.
STEP 5
( Flow Divider / Hydraulic Hose Installation )
1. Secure the hydraulic flow divider to a permanent
wall or fixture ( usually below grade ) in an area that will
allow the power hoses ( the two hoses that are installed
at the lift cylinders ) to be equal length. (See Fig 5.1)
It may be necessary to add hose extensions to accom-
modate installation. If so, keep the power hoses as
close to equal length as possible to provide equal pres-
sure and lifting.
CAUTION!
Power Hose more than 12” different in length
may result in unequal lifting of the system.
Fig. 5.1
12
WARNING!
Risk of explosion. DO NOT install the power
unit inside or near a paint booth. This equipment has
internal arcing or sparking parts which should not be
exposed to flammable vapors.
Fig. 4.1
CAUTION !
Check with building plans prior to
drilling any holes in floor.
Fig. 4.2
Summary of Contents for BendPak P-6
Page 9: ...9 P 6 P 6F Main Assembly Views...
Page 22: ...22...
Page 23: ...23...
Page 29: ...29...
Page 30: ...Main Parts View 30...
Page 31: ...31 Air Valve Parts List...