background image

- 8 -

UPPER

FLUE SECTION

NON-DUCTED

RECIRCULATION

PLENUM

AIR

VENTS

(in upper flue section)

UPPER

BRACKET

LOWER

FLUE SECTION

DUCT

SEAM

DISCHARGE

COLLAR

5" ROUND

METAL DUCT

REDUCTION

MEASURE

!

!

Non-ducted recirculation  Configuration

1. Adjust the width of the flue mounting

bracket to equal the inside width of
decorative flue. Insert and tighten
mounting screws to hold bracket width.

2. Use mounting screws and wall anchors to

secure 

flue mounting bracket

 to the

ceiling as shown.

3. Turn 

upper flue section

 upside down so

air vents

 are at the top. Slide upper flue

section into 

lower flue section

.

4. Connect the non-ducted recirculation

plenum to the upper flue section with (4)
flat-head screws (supplied).

5. Install the reduction on the discharge collar.
6. Measure the distance from the top of the

reduction

 to the ceiling. Cut a length of 

5"

round metal duct

 5" shorter than this

dimension.

7. Fit duct section over the non-ducted

recirculation plenum. For best fit, make sure

duct seam

 is toward the front.

8. Set duct/flue assembly on hood with top

tilted away from wall. Reach around flue
to engage bottom of duct with discharge
collar on hood. Tilt flue up against wall.
Duct seam can be cut to length if
necessary.

9. Extend the upper flue to the ceiling and

secure with  two mounting screws.

FLUE MOUNTING

BRACKET

MOUNTING SCREWS

=

=

FASTEN FLUE TO

UPPER BRACKET

WITH MOUNTING

SCREWS

MOUNTING SCREWS

Summary of Contents for RM51000 Series

Page 1: ...eries Broan NuTone LLC 926 West State Street Hartford WI 53027 NuTone Inc 4820 Red Bank Road Cincinnati OH 45227 Broan NuTone Canada INC 1140 Tristar Drive Mississauga Ontario L5T 1H9 ENGLISH 3 FRAN A...

Page 2: ......

Page 3: ...lean ventilating fans frequently Grease should not be allowed to accumulate on fan or filter D Useproperpansize Alwaysusecookwareappropriate for the size of the surface element WARNING TO REDUCE THE R...

Page 4: ...lar 1 Flue Mounting Bracket 8 Mounting Screws 4 8 x 38mm Pan Head 5 Mounting Screws 3 9 x 9 5mm Pan Head 8 Drywall Anchors 1 Installation Instructions MOUNTING BRACKET DISCHARGE COLLAR FLUE MOUNTING B...

Page 5: ...ble Larger ducting may be required for best performance with longer duct runs 4 Install a roof or wall cap Connect round metal ductwork to cap and work back to wards hood location Use duct tape to sea...

Page 6: ...plugged into an outlet that is properly installed and grounded WARNING Improper grounding can result in a risk of electric shock Consult a qualified electrician if the grounding instructions are not...

Page 7: ...d wall anchors to secure flue mounting bracket to the ceiling as shown 3 Use 6 round metal duct to connect the duct collar on the hood to the ductwork above 4 Use duct tape to make all joints secure a...

Page 8: ...Connect the non ducted recirculation plenum to the upper flue section with 4 flat head screws supplied 5 Install the reduction on the discharge collar 6 Measure the distance from the top of the reduct...

Page 9: ...aning tips Hot water with soap or detergent is all that is usually needed Follow all cleaning by rinsing with clear water Wipe dry with a clean soft cloth to avoid water marks For discolorations or de...

Page 10: ...requires two halogen bulbs Type T4 12V 20W ALWAYS SWITCH OFFTHE ELECTRICITY SUPPLY BEFORE CARRYING OUT ANY OPERATIONS ONTHE APPLIANCE To change bulbs 1 Loosen the ring nut by turning it counterclockw...

Page 11: ...ty Some states do not allow limitation on how long an implied warranty lasts so the above limitation may not apply to you BROAN NUTONE LLC S OBLIGATION TO REPAIR OR REPLACE AT BROAN NUTONE LLC S OPTIO...

Reviews: