R&M Materials Handling, Inc
STAGEMAKER® COMPACT Concert Hoist
Springfield, Ohio USA
SM5 Manual
: 800 955-9967
Revision 1
web:
www.rmhoist.com
08/14/02
RM-SM5-MAN-2001-1-ENG
5-1
SECTION 5
PREVENTATIVE MAINTENANCE
Maintenance table
Check
Interval
Qualification of the
customer’s personnel
Brake operation for holding and releasing
Daily
Operator
Visual inspection of the load chain
Daily
Operator
Suspension of the pendant station
Daily
Operator
Cleanliness and lubrication of the chain
Monthly
Operator
Torque limiter operation
Monthly
Operator
Measure for wear on the chain
Every 3 months
Operator
Measure for wear on the hooks
Every 3 months
Operator
Tightness of the load block screws & nuts
Every 3 months
Operator
Check the suspension hook/coupling locking plate screws
Every 3 months
Operator
Adjustment of the limiter and hoist brake
3 to 6 months
Qualified mechanic
Lubrication of open wheel gearing
3 to 6 months
Qualified mechanic
Tightness of wire terminal screws and terminal connections
Semi-annually
Qualified mechanic
Lubrication of the load block idler sprocket
Annually
Operator
Tightness of all screws to Screw Tightening Torque
Specifications and check for signs of corrosion.
Annually
Qualified mechanic
Clean motor cooling fins
Annually
Qualified mechanic
Lubrication of the gears
Lubricated for life
CAUTION!
These intervals shall be shortened if the hoist is used heavily with maximum
loads or in extreme ambient conditions.
Figure 5-1