R&M Materials Handling, Inc
STAGEMAKER® COMPACT Concert Hoist
Springfield, Ohio USA
SM5 Manual
: 800 955-9967
Revision 1
web:
www.rmhoist.com
08/14/02
RM-SM5-MAN-2001-1-ENG
4-7
Load Chain Removal
1-fall chain
1. Remove the load from the hook.
2. Disassemble the hook block.
3. Drive the chain into the chain container.
4. Remove the chain
container, unscrew and remove the lower chain guide.
2-fall chain
1. Raise the hook block to about 12” (30 cm) from the hoist body.
2. Remove the chain container.
3. Carefully remove the anchor of the load chain from the hoist body.
4. Disassemble the chain pin and the chain from the anchor.
5. Remove the 2-fall hook block, without disassembling it, letting the chain run through it.
6. Let the rest of the chain slide through the chain sprocket.
Load Chain Installation
The load chain should always be installed using the flexible plastic insertion tool (1 in Fig 4-5).
Using this tool helps to ensure that the load chain is installed correctly. Support the chain during
installation to prevent the insertion tool from distortion. Insertion tool is available from R&M.
1
Figure 4-5
1-fall chain:
1.
Insert the last chain link onto the small plastic hook of the insertion tool.
2.
Insert the other side of the tool in the sprocket as shown in Figure 4-5.
3.
Place the load chain on the chain sprocket so the chain link welds are
toward
the pocket as
shown in Figure 4-6.
4.
Raise the chain at slow speed so that the tool and the chain come out the other side of the
sprocket.