SM1 I&M MANUAL/EN/11.16.2010
51/73
This document and the information contained herein, is the exclusive property of R&M MATERIALS HANDLING, INC. and represents a non-public, confidential and proprietary trade
secret that may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M MATERIALS
HANDLING, INC. Copyright © (2010) R&M MATERIALS HANDLING, INC. All rights reserved.
6.7
Chain Container
Figure 19. Chain Container Installation
Removing Chain Container
1. Run chain out of container until fall stop approaches hoist body.
2. Open threaded links (item 1).
3. Remove chain container by slipping handles of chain container from threaded links.
Installing Chain Container
1. Reverse the above process.
2. Slip handles into open threaded links.
3. Close and tighten threaded links.
4. Guide end of chain into chain container.
5. Run chain into chain container.