Installation
POWER SHOULD BE ISOLATED THROUGHOUT THE INSTALLATION PROCESS
Step 1
Secure metal box housing to
wall or secure mounting
position.
The RAK4 system relies on
being vertically mounted to
allow the ventilation system to
work properly.
Step 2
Bring a separate 10A MCB
protected supply to each RAK
case.
Connect the Neutral and Earth
to the buzz bars as shown.
Bring the live to the front of the
metalwork ready for connection
to the circuit board.
Step 3
Bring a single Neutral and Earth
from the buzz bars to the front
of the metalwork.
Prepare screws of either side of
metalwork ready to hold the
circuit board. They should be
present and screwed loosely in
to the case.