www.raisecom.com
User Manual
17
Chapter 4
Installation and Test
This section contains the following information:
Preparation
Installation Steps
Power On Test
E1 Bit Error Test
Mask Dummy E1 LOS Alarm
Preparation
Please at first check the part number and quantity of device and spare parts according to packing list,
and then check appearance to find whether the device is in good condition. If the device is affected
with dump please dry it firstly.
To make sure the device can working normally please perform the installation and configuration
according to the following steps:
¾
Read this manual carefully;
¾
Prepare fiber, E1 cable, Ethernet cable and Agent network management cable and make sure
all the cables are in good condition, no short and no open;
¾
Make sure the voltage of power supply is in the range of working condition;
¾
Install and Deploy the device and pay attention to requirement of condition;
¾
Connect all fibers and cables and make sure they are all inserted to the end and fastened well.
¾
Use it normally.
Installation Steps
Connecting Optical Port A and Optical Port B
Insert fiber to optical port A and B on back panel.
If the device’s optical port type is M, S1, S2 and S3 the connecting method is as figure 4-1. On the
back panel TX indicates transmission of optical signal and RX indicates receiving.
Figure 4-1 Optical Port Connecting Type 1