INSTALLATION MANUAL
Technical data
Visio 70/43 F - Visio 70/43/39 3S - Visio 70/43/39 LC - Visio 70/43/39 RC
Gas type
(Natural gas - LNG)
G20
I2H, I2E
G20/G25
I2E+
G25/G25.3
I2L / I2EK
I2(43.46 -45.3 MJ/
m3 (0°C))
G20/G25
I2ELL
Supply Pressure
mbar
20
20/25
25
20
Nominal Heat Input
Gross (Hs)
kW
11.5
11.5 / 10.6
10.6
9.8
Nominal Heat Input
Net (Hi)
kW
10.4
10.4 / 9.5
9.5
9.0
Consumption
m³/hr
1.075
1.075 / 1.15
1.15
1.1
Burner Pressure
(hot)
mbar
18.5
18.5 / 22
22.1
18.0
Injector Marking
180 Centre, 320 Left, 320 Right
Pilot
G30-ZP2-312 (31.2 inj)
Efficiency Class
1
NOx Class
5
Type
C11 / C31
Gas type
(Town gas)
G150.1
Supply Pressure
mbar
8
Nominal Heat Input
Gross (Hs)
kW
9.4
Nominal Heat Input
Net (Hi)
kW
8.4
Consumption
m³/hr
1.550
Burner Pressure
(hot)
mbar
3.5
Injector Marking
400 Centre, 700 Left, 700 Right
Pilot
G150.1 CG (inj. 27.1 - 90)
Efficiency Class
1
NOx Class
5
Type
C11 / C31
60 - GB
GB
Summary of Contents for VISIO 3 Series
Page 14: ...INSTALLATION MANUAL 5 Position the bottom grate above the burner 14 GB GB ...
Page 24: ...INSTALLATION MANUAL INSTALLATION MANUAL 1000 1000 150 1000 50 Tunnel models 24 GB GB ...
Page 70: ...INSTALLATION MANUAL DECLARATION OF PERFORMANCE 70 GB GB ...
Page 71: ...INSTALLATION MANUAL DECLARATION OF PERFORMANCE GB 71 GB ...
Page 72: ...INSTALLATION MANUAL DECLARATION OF PERFORMANCE 72 GB GB ...
Page 73: ...INSTALLATION MANUAL DECLARATION OF PERFORMANCE GB 73 GB ...
Page 74: ...INSTALLATION MANUAL DECLARATION OF PERFORMANCE 74 GB GB ...
Page 75: ...INSTALLATION MANUAL DECLARATION OF CONFORMITY GB 75 GB ...
Page 76: ...INSTALLATION MANUAL DECLARATION OF CONFORMITY 76 GB GB ...
Page 99: ...INSTALLATION MANUAL Flue parts GB 99 GB ...
Page 100: ...INSTALLATION MANUAL 100 GB GB ...
Page 101: ...INSTALLATION MANUAL GB 101 GB ...
Page 102: ...INSTALLATION MANUAL 102 GB GB ...
Page 108: ...INSTALLATION MANUAL 108 GB GB ...