background image

 

Step #3: Install Brackets to Wall 

Install Top Brackets 

Place your brackets in the positions that have been measured and marked. We highly 
recommend having at least one screw go into a stud with each bracket. Install drywall 
anchors wherever necessary on the remaining holes if studs are not possible. Once any 
anchors are in place, place the brackets and insert the provided screws into each of the 
holes.  

 

Install Bottom Brackets 

Place your brackets in the positions that have been measured and marked. For the best 
fit and durability, mount all screws into a stud. If this is not possible, install drywall 
anchors into the marked positions and insert a screw into this on the remaining holes. 
Once any anchors are in place, place the brackets and insert the provided screws into 
each of the holes. If you have floorboards, you will need to place a spacer board equal to 
the thickness  of your floorboard behind the top hole (this is fairly common) 

Step #4: Install Screen to Brackets 

Unfold your screen and lay flat on a clean surface. The bottom of your screen will be the 
flap without the velcro attachment. Hold the top of the screen at each corner and align 
the corner grommet to the hole in the top bracket. Insert the elevator bolt through the 
grommet and the hole in the bracket, then fasten the washer and nut to the end of the 
bolt, hand tighten the nut to secure the fitting. Repeat this process for each of the 
remaining three corner brackets.  

Step #5: Install Side Netting 

Unpack your triangular side netting and indicate the right side from the left. Lay out the 
nets and locate the 8’ section that contains the velcro as well as the 10’ length section. 
The following diagram indicates where the velcro will need to be positioned. Attach the 
velcro portion of the side net to the side flap of your HomeBay Impact Screen from top to 
bottom. The side net should be the same height as the impact screen if properly 
fastened. Fasten the sandbags to the far corner of the side netting and fill with your 
heavy object of choice. Fasten the top grommet of the net to the impact screen utilizing 
the ball bungees provided for a tighter fit.  

Summary of Contents for HomeBay

Page 1: ...HOMEBAY INSTALLATION GUIDE Questions Contact Us support rainorshinegolf com 1 888 831 9489...

Page 2: ...ts List Home Bay Impact Screen and Netting Parts List Step 1 Layout Pieces of Hardware Kit Step 2 Locate Wall Studs and Make Measurements for Installation Step 3 Install Brackets to Wall Step 4 Instal...

Page 3: ...ons laid out in this manual carefully If needed you can reach our support staff by phone at 1 888 831 9489 Ext 1 support rainorshinegolf com We are here to help Optional Pro tip Order some pizzas mayb...

Page 4: ...keting and Hardware Parts List Extra pieces will be included Part Specs Quantity Image Top Brackets 18 x 20 2 Bottom Brackets 18 x 20 2 Hex Washer Head Screws 12 Drywall Anchor 12 Elevator Bolt 2 4 Fl...

Page 5: ...ccessories Parts List Part Specs Quantity Image White Impact Screen 8 x 10 1 Triangular Side Nets 8 x 10 2 SandBags 2 Ceiling Net 10 x 6 1 Ceiling Hooks 3 2 Ball Bungees 6 4 Recommended Tools not incl...

Page 6: ...d Make Measurements A stud finder is recommended for this step not provided We have provided drywall anchors for your use however for the tightest fitting screen we recommend using as many stud locati...

Page 7: ...o Brackets Unfold your screen and lay flat on a clean surface The bottom of your screen will be the flap without the velcro attachment Hold the top of the screen at each corner and align the corner gr...

Page 8: ...iling marking the positioning of the grommets on your ceiling Insert the ceiling hooks into your ceiling and hook the corner grommets to each of the ceiling hooks For an average ceiling height of 9 fe...

Reviews: