Always check
before
digging to be sure the site is free from utility lines
or other obstructions. We recommend that you contact a local utility
detection company or
call 811 within the United states
to locate a
certified utility detection company in your area. It is recommended that
you spray paint the splash pad location, valve location, tank location,
plumbing runs, electrical runs and equipment location before
construction begins.
Excavate the splash pad area so that your finished concrete slab is at
desired elevation. Keep in mind that the concrete slab must be a
minimum of 4” thick or per local codes and guidelines.
Grade all other areas around the splash pad site so that water not
captured within the splash pad area will drain
away
from the splash pad.
Depending on site conditions,
other grading may be necessary.
Your Splash Pad Product and Installation Resource
Pre-Site Grading