INSTALLATION INSTRUCTIONS
TA05A140.A0307
11
B
C
A
3.2 Boiler room – Installation requirements
Please refer to local and national standards in force in the Country of destination of the product. In particular the
manufacturer recommends:
The presence of threaded connections on the gas line, require that the room in which the appliance is
installed is ventilated by means of air intakes.
Boilers can be installed outdoor, in a partially protected place in conformity with Local Regulation and
if the outside minimum temperature is not lower than –10°C, ensuring gas and electric mains to the
appliance. The manufacturer is not responsible for external installations where the outside
temperature is lower than – 10°C or not in conformity with above instructions.
3.3 Unpacking
■
The materials (cardboard) used for packing the appliance are fully recyclable.
■
It is recommended that the packing material is only removed prior to installing the boiler. The
manufacturer will not be held responsible for damage caused by incorrect storage of the product.
■
Packing materials (plastic bags, polystyrene, nails, etc.) must not be left within reach of children, in that
these items represent a potential hazard.
A.
Place
the
packed
appliance on the floor (see fig.
1) making sure that the "up”
arrow is facing down. Remove
the staples and open out the
four flaps of the box.
B.
Rotate the boiler 90° while
manually supporting it from
underneath
C.
Lift the box and remove the
protections. Lift the boiler by
grasping the rear part and
proceed with the installation.
STORAGE & HANDLING
Please note that prior to
installation the Radiant boilers
should be stored in the
horizontal position with no
more than three boilers to a
stack;
Ensure that the boilers are
stored in dry conditions and be
aware that the carton is a tow-
man lift;
Fig. 1
Summary of Contents for RK 25
Page 2: ......