Installation Manual
COMBI - TA05A005.C0604
12
STARTING UP THE BOILER
•
open the gas cock;
•
turn on the boiler;
•
set the selector to
7
winter;
•
make sure that 6 and 7 light are ON (fig.2 pag. 11 Pos. 6 and 7) on the boiler panel. If light no. 5 is ON, it means water
deficiency in the system: fill the system until a pressure of 1,5 bar has been reached (light no. 7 ON; fig 2 pag. 11) and then
close the tap. The automatic ignition system will turn the burner ON. It may be necessary to repeat the procedure a few times
to purge air from the pipes. To repeat the ignition procedure in any case wait 3 minutes before turning the boiler off and on
again, then try to ignite it once more;
•
calibrate the boiler;
•
after carrying out this operation, return the panel to its correct position and put the front casing back;
REGULATING THE HEATING TEMPERATURE
The heating temperature is regulated by turning knob
2
(fig.1 pag. 11) to the temperature required, chosen from the different
values printed around the selector.
The temperature range goes from a minimum of 35°C to a maximum of 80°C.
REGULATING THE HOT WATER TEMPERATURE
The hot water temperature is regulated by turning knob
3
(fig.1 pag. 11) to the temperature required, chosen from the different
values printed around the selector.
The temperature range goes from a minimum of 35°C to a maximum of 60°C.
EMPTYING THE CENTRAL HEATING THE SYSTEM
Whenever it is necessary to empty the system, proceed as follows:
•
turn off the main power supply switch;
•
wait for the boiler to cool down;
•
undo the system drain tap and use a container to collect the water that runs out;
WARNING
Please ensure that the boiler in commissioned in line with all BENCHMARK BOOKLET REQUIREMENTS. Failure to do this may
in validate the guarentee.