51
R2C 28 - RAD - ING - Manuale - 2101.1_SKB1.3_MIAB3013_R7_B3_v.28_kW_firm.H048D
2 Ac
ce
s
s
o c
a
ld
aia
_
R
2
K
_
SK
.2
_
R
7
_
EN
2. MAINTENANCE
SUPPOR
T
CENTRE
2.2.12. ACCESSING THE BOILER
For the majority of the control and maintenance
operations you have to remove one or more panels
of the casing.
The side panels can be removed only after
removing the front panel.
To intervene on the front of the boiler proceed as
follows:
› remove the fastening screws (1 - fig.1) placed on
the lower edge of the front panel;
› grab the front panel from the bottom and
remove it pulling it to yourself and then upwards
(see fig. 1).
To intervene on the side panels of the boiler
proceed as follows:
› remove the fastening screws (2 - fig.1) placed on
the front edge of the side panel;
› grab the bottom of the panel and remove it by
moving it sideways and then pulling it upwards
(see fig. 1).
1
2
2
1
fig. 1