
2
R2C 28 - RAD - ING - Manuale - 2101.1_SKB1.3_MIAB3013_R7_B3_v.28_kW_firm.H048D
R
2
C 2
8
_
E
N
SUMMARY
SUMMARY
INTRODUCTION
4
1. INSTALLER SECTION
7
1.1. INSTALLATION
8
1.1.1. GENERAL INSTALLATION WARNINGS
8
1.1.2. BOILER LOCATION ENVIRONMENTAL REQUIREMENTS
8
1.1.3. REFERENCE LEGISLATION
9
1.1.4. UNPACKING
10
1.1.5. OVERALL DIMENSIONS
11
1.1.6. JIG
11
1.1.7. FASTENING JIG
11
1.1.8. POSITIONING AND MINIMAL TECHNICAL SPACES
12
1.1.9. CIRCULATOR PREVALENCE/FLOW DIAGRAM
14
1.1.10. HYDRAULIC CONNECTION
15
1.1.11. SYSTEM FILLING
16
1.1.12. FILLING THE CONDENSATE COLLECTION SIPHON
17
1.1.13. ANTI-FREEZE PROTECTION
18
1.1.14. GAS CONNECTION
19
1.1.15. ELECTRICAL CONNECTION
19
1.1.16. OPTIONAL ELECTRICAL CONNECTIONS
20
1.1.17. FUME EXHAUST FITTINGS
22
1.1.18. TYPES OF FUME EXHAUST SYSTEMS
23
2. SUPPORT CENTER SECTION
27
2.1. FIRST START-UP
28
2.1.1. PRELIMINARY OPERATIONS FOR FIRST START-UP
28
2.1.2. BOILER COMMISSIONING
29
2.1.3. CO2 VALUE CHECK AND CALIBRATION
30
2.1.4. ACCESSING AND PROGRAMMING THE PARAMETERS
31
2.1.5. MIAB3013 PARAMETERS TABLE
34
2.1.6. ELECTRIC FAN FREQUENCY/HEAT CAPACITY DIAGRAM
41
2.2. MAINTENANCE
42
2.2.7. GENERAL MAINTENANCE WARNINGS
42
2.2.8. TECHNICAL DATA
43
2.2.9. TECHNICAL ASSEMBLY
48
2.2.10. HYDRAULIC BOARD
49
2.2.11. WIRING DIAGRAM
50
2.2.12. ACCESSING THE BOILER
51
2.2.13. ACCESSING THE ELECTRONIC BOARD
52