18
Concrete to top
of weld point
on A-Frame
Concrete to top of
A-Frame horizontal
Trench
27”
8”
12”
CONCRETE REQUIREMENTS
Drawings are for illustrative purposes and are not to scale.
SIZE
AREA
VOLUME
YARDS
YARDS w/Collar
12 X 16
5' x 8" x 27"
21 cu. Ft.
1.5 yard
3.25 yards
12 X 20
9' x 8" x 27"
36 cu. Ft.
2 yards
4 yards
12 X 24
13' x 8" x 27"
52 cu. Ft.
2.5 yards
5 yards
16 X 24
9' x 8" x 27"
36 cu. Ft.
2 yards
4.5 yards
16 X 28
13' x 8" x 27"
52 cu. Ft.
2.5 yards
5.5 yards
16 X 32
17' x 8" x 27"
68 cu. Ft.
3.5 yards
6.75 yards
18 X 34
17' x 8" x 27"
68 cu. Ft.
3.5 yards
7 yards
Follow Table Below For Concrete Requirements. Use Standard Swimming Pool Collar Mix Concrete.
CHECK LEVEL PLUMB AND SQUARE OF POOL ONE FINAL TIME BEFORE POURING CONCRETE
Fill trench to top of the A-Frame horizontal inside of the pool and to top of weld point on A-Frame on the outside of the
pool (
Fig. A). Allow 24 hours to set before filling pool completely.
A.