The bottom channel, once assembled,
creates the framework for all remaining
assembly and must be done first. Both
top and bottom channels come with
welded extensions at one end to
connect tracks together.
To assemble, align holes on extension
over holes in channel track. Insert 3/8”
bolts with 9/16” head with washers from
beneath the bottom track using open end
wrench.
For top channel, insert bolts with washers
from above the channel.
DO NOT OVERTIGHTEN!
Check bottom track for cleanliness.
Track should be free of all dirt and debris.
Check that the bottom track is square.
(See Dig Specifications for dimensions)
The measurements from point “A” to
point “C” and from point “B” to “D”
should be the same.
CHANNEL ASSEMBLY
Top Channel
Bottom
Channel
IMPORTANT: BEFORE YOU BEGIN
The selection and preparation of the pool site is your responsibility. The manufacturer can only
suggest the proper techniques, indicate the important considerations and emphasize the precautions
and cannot be held responsible for damages to your pool that may result from failure to carefully
follow all pool specifications.
All Radiant Pool components are engineered to provide a precise fit. It is very important to handle all
components with care. Prior to assembly, all pool components should be free of sand, mud, dirt and
debris of any kind.
We recommend a small broom or shop-vac to maintain a clean track system throughout the
installation process. In addition we recommend a damp cloth be available in the event that any dirt or
debris finds its way to the panel surface.
A
C
B
D
Summary of Contents for Keystone
Page 1: ...Keystone Pool Assembly Manual...
Page 2: ......