Page 4
Installation Instructions
Step 3.
Bracket Locations:
The figures below and on page 5 depict the locations of the
bracket for various servers. These figures represent the left side of the rack.
Steps 4, 5, and 6 describe the mounting of each bracket type.
2U Servers (Mounts two PowerEdge 2450, 2550)
4U Servers (PowerEdge 6450)
5U Servers (PowerEdge 2500)
The "Blue Button" on the front of
the Dell RapidRail aligns here
"059" Brackets
Flush Structural Bracket
The "Blue Button" on the front of
the Dell RapidRail aligns here
The "Blue Button" on the front of
the Dell RapidRail aligns here