User Manual 1260-36
Installation Instructions 2-1
Chapter 2
INSTALLATION INSTRUCTIONS
Unpacking and
Inspection
Before
unpacking the switching module, check the exterior of the
shipping carton for any signs of damage. All irregularities should
be noted on the shipping bill. Remove the instrument from its
carton, preserving the factory packaging as much as possible.
Inspect the switching module for any defect or damage.
Immediately notify the carrier if any damage is apparent. Have a
qualified person check the instrument for safety before use.
CAUTION
Proper ESD handling procedures must always be
used when packing, unpacking or installing any 1260
Series cards. Failure to do so may cause damage to
the unit.
Reshipment
Instructions
Use the original packing when returning the switching module to
Racal Instruments for calibration or servicing. The original shipping
carton and the instrument's plastic foam will provide the necessary
support for safe reshipment. If the original packing is unavailable,
wrap the switching module in plastic sheeting and use plastic
spray foam to surround and protect the instrument. Reship in
either the original or a new shipping carton.
Option 01
Installation
Installation of the Option 01 to the 1260-36 is described in the
Installation Section of the 1260 Series VXIbus Switching Cards
Manual.
Module
Installation
Installation of the 1260-36 Switching Module into a VXIbus
mainframe, including the setting of DIP switches, is described in
the Installation Section of the 1260 Series VXIbus Switching Cards
Manual. Configuration of the PCBA and setting DIP switches S1-5
and S1-6 are described in the following sections.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com