9
We reserve the right to make technical changes.
1. Towing
1.1 Coupling the implement
Couple the lower-arm floating axle (9.1/1). Cor-
rectly secure the coupling assembly.
Secure the tractor’s lower arm in the centre.
Retract the support stands (9.1/2).
1.2 Brakes
Connect the yellow brake line (9.2/2). Connect the
red brake line (9.2/1).
The spring-loaded brake is released as pressure
builds up in the braking system.
1.3 Electrical connections
There are three electrical connection points at the
front of the machine:
- Power lead (9.3/1) for the electrical dosing-
mechanism drive.
- Control lead (9.3/2) to act as connection for the
drill computer.
- Connection lead (9.3/3) for the lighting system on
the trailer drilling machine.
1.4 Hydraulic connections (9.3/4)
Depending on the configuration of the implement,
the following hydraulic connections are required:
- Single-action control device with Ø 22 mm non-
depressurized return conduit for the hydraulic
blower drive
(Plug-in coupling subass. 4).
- Twin-action control device for the running gear.
- The twin-action control device for the lane marker
can be switched over, when required, to alter the
receiver pressure of the hydraulic coulter rail load.
2. Transport position
2.1 The implement
Raise the implement at the back and front so that
the frame is lifted horizontally. (9.4)
2.2 Folding in the sowing rail and soil
preparation tools / roller
Note that the implement must be fully raised for
folding in and out. (9.4)
Fold in the folding parts with the twin-action con-
trol device. The folding half-sections are locked
hydraulically in their retracted position.
Caution: Block the tractor‘s onboard control unit to
prevent accidental operation during transport ope-
rations. Switch off the electronic system and/or pull
out the plug.
2.3 Safety
Before transporting on public roads, ensure that
the safety devices are attached and that the road
lights are in working order.
Observe the transport procedures.
9.1
9.2
9.3
9.4
1
2
1
2
1
3
2
4