84
RabbitCore RCM4100
•
Current Measurement Option
—You may cut the trace below header JP1 on the
bottom side of the Prototyping Board and install a 1 × 2 header strip from the Develop-
ment Kit to allow you to use an ammeter across the pins to measure the current drawn
from the +5 V supply. Similarly, you may cut the trace below header JP2 on the bottom
side of the Prototyping Board and install a 1 × 2 header strip from the Development Kit
to allow you to use an ammeter across the pins to measure the current drawn from the
+3.3 V supply.
•
Backup Battery
—A 2032 lithium-ion battery rated at 3.0 V, 220 mA·h, provides
battery backup for the RCM4100 series SRAM and real-time clock.
Summary of Contents for RabbitCore RCM4100
Page 1: ...RabbitCore RCM4100 C Programmable Core Module User s Manual 019 0153 090508 G...
Page 18: ...14 RabbitCore RCM4100...
Page 102: ...98 RabbitCore RCM4100...
Page 106: ...102 RabbitCore RCM4100...
Page 110: ...106 RabbitCore RCM4100...
Page 112: ......