background image

 

 

Refer to the R9 Technology installation video located online: 
 

www.r9technology.com/resources-videos

 

 
Required Items: 

 

Items included with the G200:

 

 

• 

Qty 01, G200 Gateway

 

• 

Qty 01, DC Power supply (Includes 10-foot power cord)

 

• 

Qty 02, Phillips head screws, #10 screw, 1 inch in length

 

• 

Note: The LTE data service SIM card is pre-installed at the factory.

 

   

 

Additional items required depending on the mounting option selected for each node. 

• 

Small Phillips head screw driver 

  

• 

Option- Other fasteners types or double-sided foam adhesive tape can also be used to install the G200 gateway.

 

 

 

Mounting Location Considerations: 

 

 

 

1. 

Mount the G200 above a 120V 60Hz power outlet.  The G200 gateway should be installed as high as possible for best RF 
(wireless) performance. 

 
2. 

Attempt to install sensor nodes close to the gateway (but do not install nodes closer than 5 feet).  Also install sensor nodes 
as high as possible on equipment, for best wireless (RF) performance.  The gateway should be in the center of the sensor 
node grouping. 

 
3. 

To ensure the best wireless performance select a “free-space” installation location that is not near, or covered by, large metal 
objects.  Avoid mounting the gateway to concrete walls or metal surfaces (wood or sheet-rock mounting surface is preferred).  
If no wood or sheet-rock surfaces are available, then mounting to metal, concrete, or brick surfaces is acceptable. 

 
4. 

For indoor operation, select a location that is not exposed to drastic temperature changes, and not in direct sunlight.   Avoid 
areas of temperature extremes (for example, heat from ovens, cooling racks, hot exhaust). 

 
5. 

Install the G200 gateway in an “out of the way” location that does not affect the daily movement and working conditions of 
persons or employees   Ensure the G200 gateway is installed in a place that allows easy access for servicing (removal of lid, 
or removal of complete G200 device from the wall). 
 

6. 

For outdoor operation, solar loading on the plastic enclosure can heat the electronics inside the case.  Avoid mounting 
locations that are in direct sunlight,  especially at mid and late day.  Mount the gateway under building eaves, or other 
protected areas.  A solar hood will be required when mounting in direct sunlight. 
 

 

Summary of Contents for G200

Page 1: ...1 R9 Technology G200 Gateway Installation Guide This instruction sheet provides information on installation of the G200 Gateway Release 1 5 ...

Page 2: ...uping 3 To ensure the best wireless performance select a free space installation location that is not near or covered by large metal objects Avoid mounting the gateway to concrete walls or metal surfaces wood or sheet rock mounting surface is preferred If no wood or sheet rock surfaces are available then mounting to metal concrete or brick surfaces is acceptable 4 For indoor operation select a loc...

Page 3: ...connection is good If the LED flashes red the node device has not paired yet After the entry of the device serial numbers into the portal the pairing should happen within 3 to10 minutes There is no power switch on the gateway device When the G200 gateway is plugged into AC power for the first time the unit will power on and initialize boot up After 30 seconds of initialization the gateway will out...

Page 4: ...ne Portal User Guide Installation Considerations 1 Do not over use tape screws or other fasteners as removal and servicing of the system may be necessary in the future 2 Heat from ovens or hot exhaust can adversely affect GATEWAY operation Avoid these areas for installation 3 Only install the gateway in weather protected areas out of direct sunlight If installed outdoors select areas that are prot...

Page 5: ...5 For questions and support please contact R9 Technology 17217 Waterview Parkway Suite 1 202Y Dallas TX 75252 USA Product information www r9tech com Support e mail address requests r9tech com ...

Reviews: