Quorum Windmill 96015 Series Installation Instructions Manual Download Page 6

Fig. 10

WARNING -

Turn off the power!

NOTE: 

Please see the label of the blade 

side up as illustration shown for 
assembly.

1.    Slide the blade deco plate to position 
the blade hole on the center of the blade. 
Insert the blade deco bar into the hole in 
the blade and secure with a blade deco 
plate screws (Screw No. 1). (Fig. 8 & 9)

Caution:

 

Do not tighten screws at this 

point. All screws will be tightened after 
the complete assembly of blades on the 
fan. 

2.    Assemble each blade as in step 1/Fig. 
8 & 9 to complete the blade circle. Align 
the holes on the blade deco bars and 
secure with the blade deco bar screws 
(Screw No. 2), as show on Fig. 10. 

Caution:

 

Do not tighten screws at this 

point. All screws will be tightened after 
the complete assembly of blades on the 
fan.

3.   Follow the same assembly process 
through the 14th blade.

4.   Slightly lift the14th blade to position 
the 15th blade and screw it to complete 
the blade circle. (Fig. 11)

5. ATTACHING THE FAN BLADES

Fig. 8

Fig. 11

Fan blade

Screws

(Screw No. 1)

Hole

“This side up”
label

 Blade deco bar

 Blade deco bar

Blade deco plate

Blade deco plate

Fig. 9

Blade deco bar 
screws
(Screw No. 2)

 Blade deco bar

 Blade deco bar

Blade deco bar 
screws
(Screw No. 2)

15th Blade unit

Summary of Contents for Windmill 96015 Series

Page 1: ...ese instructions These instructions are to be used in the installation of the following QUORUM INTERNATIONAL fans The Windmill w optional light feature P O Box 961008 Fort Worth TX 76161 817 626 5483...

Page 2: ...stions regarding the warranty or the procedures for obtaining service please call us at 817 626 5483 Monday thru Friday 8 00 a m 5 00 p m CST technical skill competence or experience of the user 8 Lig...

Page 3: ...NG CONTACTYOUR DEALER FOR REPLACEMENT OR CALL QUORUM DIRECTLYAND WE WILL MAIL REPLACEMENTS TO YOU IMMEDIATELY 1 To avoid possible electric shock turn off the electricity at the main fuse box or circui...

Page 4: ...nds 22 7 kg WARNING Support Directly from the Building Structure 3 Secure the outlet box or make sure the existing box is secured directly to the building structure Use appropriate fasteners and build...

Page 5: ...ASSEMBLY SHOULD BE WORKED AT THE FLOOR 3 Remove the set pin and safety lock clip from the yoke on top of the motor assembly Slide the downrod through the canopy and canopy cover Slide the yoke cover o...

Page 6: ...e the blade circle Align the holes on the blade deco bars and secure with the blade deco bar screws Screw No 2 as show on Fig 10 Caution Do not tighten screws at this point All screws will be tightene...

Page 7: ...ow is the time to tighten all the blade and blade arm screws Be sure all screws are fully tightened Be sure not to forget screws No 1 and No 2 Fig 15 6 Lift the fan motor with the blades and place int...

Page 8: ...he other side 2 Fig 17 Connect the BLACK building supply wire to the BLACK fan wires Connect the WHITE building neutral wire to the WHITE fan neutral wire Connect the COPPER building ground wire to th...

Page 9: ...o set screws lift canopy cover and attach by turning clockwise Note Adjust the canopy screws as necessary until the canopy and canopy cover are snug Fig 18 8 COMPLETING THE INSTALLATION 9 INSTALLING T...

Page 10: ...rol will come on when the button is pressed The fan has completed the pairing process with the remote control and is ready for use NOTE A single fan can be controlled with as many as 3 remote controls...

Page 11: ...Periodically check tightness of all screws securing the blades to the blade arm attachment points A clicking or a rattling noise is a sure indication of loosening screws Since screws will invariably w...

Page 12: ...against the canopy possibly vibrating while the fan is on 3 Use of a standard light rheostat or an unapproved fan remote control to control the fan speed will always cause an annoying hum Many fan mot...

Reviews: