background image

 

 

 

QUNDIS 

 

 

01.09.2019  12 

Previous month's values “LOOP 2” 

 

Previous month's values 

 

Log date 

 

Max. power in 2 s 

cycles with date 
stamp 

 

Energy quantity on set 
day 

 

 

Cooling registers on set 
day (optional) 

 

Max.  temperature  hot 
side in 2 s cycles with 

date stamp 

 

 

 

Volume on set day 

 

Max. temperature cold 

side in 2 s cycles with 
date stamp 

 

Missing time on set day 

 

 

Max. flow on set day in 2 

s cycles with date stamp 

 

 

 

 

General/Communication "LOOP 3" 

 

General/Communication 

 

Device number,  
7-digit 

 

Yearly set day 

 

Optional interface 

 

Monthly set day 

 

Primary address (only 

for M-Bus) 

 

Firmware version 

 

Secondary address  

7-digit - for M-Bus 

 

CRC-Code 

Other “LOOP 4” 

 

Other 

 

Date 

 

Code entry for test /  

para operation 

 

Time 

 

4.1 

Monthly values 

The  meter  stores  the  following  values  for  24  months  on  the 
monthly set day 

 

Missing time 

 

Volume  

 

Energy 

and the maxima with date stamp for 

 

Flow 

 

Power 

 

Temperature hot side 

 

Temperature cold side 

4.2 

Parameterisation 

When  the  LCD  displays  the  code  entry,  you  can  call  up  the 
parameterisation  operation  by  inputting  the  code.  You  can set 
date and M-Bus primary address in the parameterisation oper-
ation for example. For more detail see separate parameterisa-
tion instruction. 

5. 

Getting Started 

For activation proceed as follows: 

 

Open the slide valves slowly. 

 

Check the heating system for leak-tightness and bleed air 
out carefully. 

 

Press the button on the meter briefly. 

The message "F0" disappears after 10 sec. 

 

Check the measured values for flow and temperatures for 
plausibility. 

 

Vent the heating system until the flow display is stable. 

 

Fit the user locks to the fittings and the temperature sen-
sors. The scope of supply includes two self lock seals for 
sealing a sensor and the connecting fitting. 

 

Read the meter status for energy, volume, operation and 
missing time and note the values. 

Error messages for incorrect installation: 

 

Error "incorrect flow direction (negative)" 

Check that the flow direction arrows on the volume measurement unit 
match the flow direction of the system. If the directions do not match, 

turn the volume measurement unit through 180°. 

 

Error "negative temperature difference" 

Check whether the sensors are installed correctly. If the sensors are 

not installed correctly, change the installation position of the sensors. 

 

Heating meter: 

Temperature sensor in the flow-pipe with higher temperatures; temper-

ature sensor in return-pipe with lower temperature 

 

Cooling meter: 

Temperature sensor in the flow-pipe with lower temperatures; tempera-
ture sensor in return-pipe with higher temperature 

6. 

Functional Details 

If  the  respective  operation  thresholds  are  exceeded  and  flow 
and  temperature  difference  are  positive,  the  meter  summates 
the energy and the volume.  

 

If the operate margin is gone below a "u" is displayed at a leading 
point for the flow, power and temperature display. 

For  a  positive  flow  the  activity  display 

  appears  in  the  user 

loop in the LCD.  
All segments of the display are switched on for control purpos-
es  during  the  segment  test.  The  flow,  power  and  temperature 
difference are recorded with the appro/- signs. 
The  operating  hours  are  counted  from  the  first  connection  of 
the  power  supply.  The  meter  saves  "operating  time  with  flow" 
as  soon  as  a  positive  flow  is  recognised.  Missing  hours  are 
summated  if  there  is  a  fault  and  the  meter  is  thus  unable  to 
take a measurement. 

Stored maximum values are marked with an "

" in the lower 

right hand area of the LCD. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Reviews: