MAINTENANCE SCHEDULE CHECKLIST
Use this form to develop a routine maintenance schedule and record of performed maintenance. In the numbered columns enter the initials
of the person who performed the maintenance and the date. Enter additional maintenance procedures in the spaces provided in the left hand
column as needed per your application.
Equipment operating under humid or dirty conditions may require shorter intervals between scheduled maintenance.
The instruction manual provided with Quincy Compressor products, as well as any instructions supplied by manufacturers of supporting
equipment, should be read and understood prior to performing maintenance.
NOTE: Make your entries on a copy of this form. Retain this original form to make more copies in the future.
Suggested Weekly (40 hrs.) Intervals
Maintenance Procedures
1
2
3
4
5
6
7
8
9
10
11
12
•manually test pressure relief valves
•
•clean surfaces of intercooler
•
•check distribution system for leaks
•
•check for contaminated lubricant *
•
•check for compressor/vacuum leaks
•
•
Suggested Monthly (160 hrs.) Intervals
Maintenance Procedures
1
2
3
•check belt tension (if applicable)
•
•torque sheave fasteners (if applicable)
•
•change lubricant (& filter if applicable)*
•