![Quincy Compressor QGD 40 Instruction Book Download Page 75](http://html1.mh-extra.com/html/quincy-compressor/qgd-40/qgd-40_instruction-book_3767994075.webp)
5
Operating instructions
5.1
Initial start-up
The operator must apply all applicable
.
For the location of the air outlet valve and the drain connections, see sections
Preparations
1. Consult the sections
.
2.
The following transport fixtures, painted red, must be removed:
• Bolt and bushes or support under the motor (1)
• Bolts and bushes under the gear casing (2)
• Bolts or bolts and bushes under the oil separator vessel (3)
3. Check that the electrical connections correspond to the applicable codes and that all wires
are clamped tight to their terminals.
The installation must be earthed and protected against short circuits by fuses of the inert
type in all phases. An isolating switch must be installed near the compressor.
4. Check transformer (T1) for correct connection.
Check the settings of drive motor overload relay (F21).
Check that the motor overload relay is set for manual resetting.
Instruction book
2920 7190 02
73
Summary of Contents for QGD 40
Page 1: ...Quincy Oil injected rotary screw compressors QGD 40 QGD 50 QGD 60 Instruction book...
Page 2: ......
Page 14: ...Front view compressors with integrated dryer Instruction book 12 2920 7190 02...
Page 15: ...Front view open compressors without dryer Instruction book 2920 7190 02 13...
Page 16: ...Rear view compressors without dryer Instruction book 14 2920 7190 02...
Page 17: ...Front view open compressors with integrated dryer Instruction book 2920 7190 02 15...
Page 112: ......
Page 113: ......