5.3 Starting
Procedure for regulator as shown
Procedure
Reference
Action
-
At least 10 minutes before starting, the main supply to the dryer must be switched on to initialize
the regulator and flow switch.
-
Close the dryer by-pass valve, if installed.
-
Press start button (14).
-
Open the dryer air inlet valve (customer's installation).
-
Approx. 5 minutes later, open the dryer air outlet valve (customer's installation).
-
Approx. 10 minutes later, the nominal dew-point will be reached.
5.4 During operation
Description for regulator as shown
Regularly check:
•
The pressure dew-point on the display of the control panel. The pressure dew-point will deviate
from nominal if the air inlet conditions or volume flow differ from nominal.
•
That condensate is discharged. The amount depends on the operating conditions.