Step 3:
Connecting the Washout assembly. Connect the fixed length plastic “A” arms to
the Swashplate, connect to the two longer pivot studs, if all four are the same length
then any two will do. The next step is to adjust the length of the linkage rod between the
Washout Arm and the Flybar connection point. Turn your radio and receiver back on and
center both sticks. Now adjust the length of the flybar linkage so the washout arms are
level (horizontal), see picture 1. Also make sure your flybar arms and flybar-paddles are
level (horizontal), when adjusting the linkage. After the length is adjusted make sure that
you have free travel in all directions and stick positions. When the Pitch stick is all the
way up it should look like picture 3. As you can see there is still plenty of room for aileron
and elevator travel. Now adjust the Washout Anti-rotation pin height so the pin is still in
the guide slot of the washout base during all travel positions. For the Left/Right Washout
Anti-rotation position, line the attachment point of the plastic washout “A” arm on the
Swashplate up with flybar linkage connection point. The imaginary line between these
points should be vertical.
Now you are almost done, only one set of links left, and the length of those links will be
depending on your desired setup whether it's Aerobatic or normal flying. Please refer to
the Pith travel setup table for this final link length.
Picture 3, Swash Up
Picture 4, Head
Page 74 of 85
Summary of Contents for Super Learner Pro
Page 1: ...Page 1 of 85...
Page 7: ...Page 7 of 85 REQUIRED TOOLS...
Page 13: ...Page 13 of 85 SECTION 1 UPPER FRAMES Bag 1...
Page 19: ...Note Bearing Blocks shown may look differently Page 19 of 85...
Page 28: ...Page 28 of 85...
Page 29: ...Page 29 of 85 SECTION 2 LOWER FRAMES Bag 2...
Page 32: ...Page 32 of 85...
Page 35: ...Page 35 of 85...
Page 36: ...Note Frame shown in the drawing may look differently Page 36 of 85...
Page 38: ...Note Fan Hub Assy may look differently Page 38 of 85...
Page 39: ...Page 39 of 85 Note Engine Mount may look differently from the one in the kit...
Page 42: ...Page 42 of 85 SECTION 3 LANDING GEAR ASSEMBLY Bag 3...
Page 44: ...Page 44 of 85...
Page 45: ...Page 45 of 85 SECTION 4 DRIVING SYSTEM Bag 4...
Page 48: ...SECTION 5 TAIL ASSEMBLY Bag 5 Tail Rotor shown may look differently Page 48 of 85...
Page 54: ...OR Page 54 of 85...
Page 56: ...SECTION 6 CONTROL SYSTEMS Bag 6 Page 56 of 85...
Page 58: ...Page 58 of 85...
Page 67: ...Page 67 of 85...
Page 68: ...Note the frame may look differently from the one in the kit Page 68 of 85...
Page 70: ...Page 70 of 85...