7-2 FLYBAR & SEESAW ASSEMBLY
No. Bag# Description
Qty No.
Bag# Description
Qty
1 7 Seesaw 1
9
HB
M4X4 Set Screw
2
2
7
Seesaw Collar
2
10
7 3mm
Fly-Bar
Paddle
2
3 HB
M3x8 Cap Head Bolt
4
11
7 Double
Link
2
4 HB
M3x7 Pivot Ball Stud
2
12
Step 7-1 Main Rotor Hub Assembly
1
5 HB
M3x5x1 Spacer
2
13
7
Washout Anti-rotation Pin
2
6
7
Fly-Bar Control Arm A
2
14
HB
M3x7 Flat Washer
2
7
7
Fly-Bar Control Arm B
2
15****
Epoxy Glue/JP Weld
1
8
In
3mm Standard Flybar
1
Make sure to apply Epoxy Glue/JP Weld to the thread on Flybar and the Flybar Paddle (after
you finish the Setup)
Note: The Center Hub and Flybar Control Arm shown may look differently from the ones
in the kit. Attach the Double Link to the built-in ball of the Hiller Arm and the Pivot Ball
installed on the Seesaw (see drawing).
Page 62 of 85
Summary of Contents for Big Bertha 69
Page 1: ...Page 1 of 85 ...
Page 7: ...Page 7 of 85 REQUIRED TOOLS ...
Page 13: ...Page 13 of 85 SECTION 1 UPPER FRAMES Bag 1 ...
Page 19: ...Note Bearing Blocks shown may look differently Page 19 of 85 ...
Page 28: ...Page 28 of 85 ...
Page 29: ...Page 29 of 85 SECTION 2 LOWER FRAMES Bag 2 ...
Page 32: ...Page 32 of 85 ...
Page 35: ...Page 35 of 85 ...
Page 36: ...Note Frame shown in the drawing may look differently Page 36 of 85 ...
Page 38: ...Note Fan Hub Assy may look differently Page 38 of 85 ...
Page 39: ...Page 39 of 85 Note Engine Mount may look differently from the one in the kit ...
Page 42: ...Page 42 of 85 SECTION 3 LANDING GEAR ASSEMBLY Bag 3 ...
Page 44: ...Page 44 of 85 ...
Page 45: ...Page 45 of 85 SECTION 4 DRIVING SYSTEM Bag 4 ...
Page 48: ...SECTION 5 TAIL ASSEMBLY Bag 5 Tail Rotor shown may look differently Page 48 of 85 ...
Page 54: ...OR Page 54 of 85 ...
Page 56: ...SECTION 6 CONTROL SYSTEMS Bag 6 Page 56 of 85 ...
Page 58: ...Page 58 of 85 ...
Page 67: ...Page 67 of 85 ...
Page 68: ...Note the frame may look differently from the one in the kit Page 68 of 85 ...
Page 70: ...Page 70 of 85 ...