AL3
Series
EN
B
5°
1C
A
B
C
2C
PAINT
Nm
8÷10
40 cm (16”)
QUICK
AL3Series
INSTALLATION AND USER’S MANUAL - REV000A
8
4.1 - Installation procedures
A
Identify the ideal position and drill the holes using the drilling template supplied.
B
Remove the excess material from the rope/chain passage hole, finish it and smooth it with a specific product (marine paint,
epoxy resin or gel) ensuring the free passage of the chain.
C
Position the upper section inserting the gasket between the deck and the base, and connect it to the lower section inserting
the shaft into the gearbox. Fix the windlass by screwing the nuts onto the fixing studs.
Connect the supply cables from the windlass to the reversing contactor unit.
4 - Installation
STUD
B DECK LEVEL
Ensure that the upper and lower surfaces of the deck are as
parallel as possible. If this is not the case, compensate the
difference appropriately (fig. B).
A lack of parallelism could result in a loss of motor power.
The deck thickness must be included among the figures listed
in the table.
In case of different thickness, please contact your Quick®
dealer.
C PEAK DEPTH AND BOW ROLLER HEIGHT
There must be no obstacles to the passage of cables, rope and chain under deck (fig.
1C
)
Insufficient depth of the peak could cause chain jamming (fig.
2C
).
A positive tilt of the chain in relation to the deck level of up to 5° is allowed (fig.
1C
).
An excessive negative tilt of the chain could interfere with the windlass base (fig.
2C
).
Max
5 mm (3/6”)
GASKET
FLANGE GASKET
TOP GEARBOX
NUT
GROWER
WASHER
45°