Quest IQ Compressor Wall OMM
8
September 2020
Attention! Equipment Clearances!
Proper clearances should be maintained for
adequate airflow and heat rejection! Generally, up to 36” side and
96” top clearances are required. For more information on clearances as well as equipment dimensions and other
details, refer to the submittal documentation.
Pic. C.4