1-877-420-1330
Quest 215 Dual
Installation, Operation and Maintenance Instructions
6
www.QuestHydro.com
The remote controls of the Quest 215 Dual are powered by a low voltage circuit (24 VAC) and must NEVER contact or
be connected to a high voltage circuit. The control wires leaving the Quest 215 Dual and the remote control panels are
numbered and color-coded to prevent confusion. Some of the control wires leaving the Quest 215 Dual may not be used
with certain control panels and should be left safely disconnected with wire nuts taped onto the stripped ends. Be sure
to consult the electrical schematic in this manual or inside the access panel of the Quest 215 Dual before making the
control connections.
4.3 Condensate Water Removal
Condensate drains by gravity via the drain port. Use 3/4” male NPT PVC pipe. Route drain pipe to drain. Install a trap if
possible. Take care when installing drain pipe to drain port. Use an adjustable wrench to secure the drain port. An optional
condensate pump kit may be installed if a lift is required to dispose of the condensate. The condensate pump kit can be
ordered directly from the factory. See the optional parts list for information on the kit.
When installing the drain hose make sure the feet are extended such that the dehumidifier is 2 1/2” off the ground.
Then coil the drain hose under itself or position a spacer to lift the hose 1” off the ground after the hose has touched the
ground. This procedure will create a trap that ensures your unit drains correctly. See the diagram below for further visual
clarification.
4.4 Installation Diagram
B
B
A
B
A
A
A
A
A
B
Optional Humidistat
(4020175)
Bottom view of
unit and bracket
Bracket (4036668)
note: plumb condensate
water to drain or
reclamation reservoir
P-trap
(see section 4.5 for more info)
B
B