EN
.
23
7.1. Installing the device behind a light switch
The installation process, tested and approved by professional electricians, consists of the
following simple steps:
Step 1
–
Turn OFF the fuse:
•
To prevent electrical shock and/or equipment damage, disconnect electrical power at the
main fuse or circuit breaker before installation and maintenance.
•
Be aware that even if the circuit breaker is off, some voltage may remain in the wires
—
before proceeding with the installation, be sure no voltage is present in the wiring.
•
Take extra precautions to avoid accidentally turning the device on during installation.
Summary of Contents for Flush Shutter
Page 3: ...EN 3 18 Warning 64 19 Regulations 64 ...
Page 19: ...EN 19 4 Package Contents Flush Shutter Device Installation Manual ...
Page 21: ...EN 21 ...
Page 25: ...EN 25 After Qubino installation ...
Page 31: ...EN 31 Step 2 Switch of the power supply Step 3 Connect the temperature sensor as shown below ...
Page 32: ...EN 32 Step 4 Place the temperature sensor in the switch box Step 5 Turn the fuse on ...
Page 33: ...EN 33 Step 6 Re include the device to your network ...
Page 34: ...EN 34 Step 7 Start using the temperature sensor in connection with your device ...