![QubicaAMF Options Ball Return Installation, Operation, Service, And Parts Manual Download Page 16](http://html1.mh-extra.com/html/qubicaamf/options-ball-return/options-ball-return_installation-operation-service-and-parts-manual_3572752016.webp)
I
NSTALLATION
Options
Ball Return Installation Manual
– 612-860-010
10
Rev. Date 10/07
4-
I
NSTALLING THE
B
ALL
S
TOP
The ball stop allows the ball to move down the track to the Ball Lift, but prevents the ball
from moving backwards past the ball stop should the ball fail to be handled properly by
the Ball Lift. The ball stop should be placed in alignment with the front trap door as
shown in figure 2.
1. Assemble the ball stop as shown in Figure 6. Place the tube through the hole in the
plastic stop and then position the stop between the ears of the metal bracket.
Secure the plastic stop using the 5/16-18 x 2¼-inch bolt (809-857-365) and lock nut
(844-057-002).
The longest side of the plastic stop must be placed against the
metal bracket and should hang down as shown in Figure 6.
2. Mount the Ball Stop to the first leveling strip forward of the Ball Lift as follows:
a) Center the plastic stop over the ball track with the centerline of the 2¼-inch bolt
exactly 10 inches (25.4 cm) above the track’s mounting plate.
b) Mark the leveling strip through the holes in the ball stop bracket, and drill two 7/32-
inch pilot holes for mounting the Ball Stop at the marks on the leveling strip.
c) Mount the Ball Stop to the leveling strip using 5/16 x 1½-inch lag screws (810-
556-240) and flat washers (948-761-112).
Figure 6, Ball Stop Installation