MINI MEZZANINE
0101Q001
Quax nv
Karel Picquélaan 84 B-9800 Deinze Belgium
T
T
0032 9 380 80 95 www.quax.eu -
E
E
25
Step 4.5 :
Use the mounted parts from previous steps, the crossbar
EB7
and four wood screws
H
Push the bed sides (
AB2
and
AB3
) and the crossbar (
AB4
) with their wooden dowels into the drillings and over the con-
nectors of the left-hand head board (
AB1-L
). Tighten the maxifi xes. Push the right-hand head board (
AB-2R
) with its
connectors into the holes and over the wooden dowels of the sides and the crossbar. Tighten the maxifi xes. Place the
crossbar (
EB7
) in the middle at the bottom of the supports. Push two wood screws (
H
) into the drillings on the outer edges
of the crossbar and screw into the supports.
Step 4.6 :
Use the assembled bed,
the slatted bottom
EB8
and six
wood screws
G
Place the slatted frame (
EB8
)
on the supports. Push the wood
screws (
G
) into the provided holes
of the bottom and tighten them into
the supports.