16
Site Planning Guide
QD6000/QD7000 Base System Airflow/Heat Dissipation
and Power Requirements
This section provides airflow, heat dissipation and power requirements for the QD6000/QD7000 base
system.
Airflow and Heat Dissipation
Allow at least 81 cm (32 in.) of clearance in front of the QD6000/QD7000 base system and 61 cm (24
in.) behind the QD6000/QD7000 base system for service clearance, ventilation, and heat dissipation.
provides the airflow and heat dissipation of the QD6000/QD7000 base system.
Figure 11
QS1200 Base System Airflow
1
81 cm (32 in.) clearance in front of the cabinet
2
61 cm (24 in.) clearance behind the cabinet