StorNext QM1200, QS1200 or QS2400 Base System - Replacing a Controller

April 2015

Quantum Corporation

- 1 -

Replacing a Controller in the StorNext QM1200, QS1200 or QS2400 
Base System

Use this procedure to replace a controller in the StorNext QM1200, QS1200 or QS2400 Base System. Read through all 
of the following steps in this procedure before you start to replace the controller canister.

You can determine whether you have a failed controller in two ways:

The Recovery Guru directs you to replace a failed controller.

You locate the failed controller by checking the Controller Service Action Required LED.

Before you start to replace a controller in the base system, gather antistatic protection, a new controller, and a 
controller air blocker.

When you install a new controller, you must remove the battery from the failed controller, and install it in the new 
controller. This procedure includes that task. If you are changing your current configuration, you might need to 
replace these items:

Small Form-factor Pluggable (SFP) transceivers.

Host bus adapters or host channel adapters.

Cables – InfiniBand uses copper cable, and Fibre Channel uses copper cable or fiber-optic cable.

Preparing to Remove the Controller

1.

Gather support data about your storage array by using one of these methods:

Use the storage management software to collect and save a support bundle of your storage array. From the 
Array Management Window, select 

Monitor >> Health >> Collect Support Data

. Then name and specify a 

location on your system where you want to store the support bundle.

ATTENTION  Possible hardware damage

 – If you perform this procedure with the power turned on, the 

equipment might overheat if the controller slot is left open for more than three minutes. To prevent the 
possibility of overheating, you must insert the controller air blocker into the empty controller slot when you 
service the controller.

ATTENTION  Loss of data access

 – If the controller that you are replacing manages any secure volumes, the 

new controller will need the correct security key to manage those volumes. After you replace the controller 
and restore power to the base system, you can use the SANtricity® ES Storage Manager to import the key from 
the file in which it was saved. Be sure that such a file exists and that you know the pass phrase required to 
install the security key before you replace the controller.

ATTENTION  Possible hardware damage

 – To prevent electrostatic discharge damage to the tray, use proper 

antistatic protection when handling tray components.

ATTENTION   Possible extended outage

 – You must replace the controller with the power turned on to 

ensure auto-code synchronization of the native controller firmware to the new controller and to prevent the 
possibility of an extended outage.

Summary of Contents for StorNext QM1200

Page 1: ...StorNext QM1200 QS1200 or QS2400 Base System Replacing a Controller 6 68012 01 Rev B 6 68012 01 B...

Page 2: ...Quantum the Quantum Logo Backup Recovery Archive It s What We Do Be Certain Be Quantum Certain DLT the DLT Logo DLTSage DLTtape the DLTtape Logo DXi DXi Accent Dynamic Powerdown FastSense FlexLink Go...

Page 3: ...ds Use the storage management software to collect and save a support bundle of your storage array From the Array Management Window select Monitor Health Collect Support Data Then name and specify a lo...

Page 4: ...ntroller a Set the new controller on a flat static free surface near the base system with the top cover up b Save all the packing materials in case you need to return the controller Locating the Faile...

Page 5: ...er offline From the Hardware pane in the Array Management Window right click the picture of the controller that you want to take offline and select Advanced Place Offline Run the following command SMc...

Page 6: ...April 2015 Quantum Corporation 4 Removing the Failed Controller 1 Prepare the controller air blocker Figure 3 by removing it from its packaging and folding it inward at right angles so it is ready to...

Page 7: ...Replacing a Controller 1 Release Lever 2 Controller 3 Set the failed controller on a flat static free surface with the release levers up 4 Insert the controller air blocker Figure 5 into the open con...

Page 8: ...ontroller Air Blocker into the Open Controller Slot Removing Battery Move from Failed to Serviceable Controller 1 On the failed controller Figure 6 press down on both of the top cover latch buttons an...

Page 9: ...oller b Remove the battery by sliding it towards the rear of the failed controller c Lift the battery slightly upward as you slide it to the rear of the failed controller NOTE You will insert this bat...

Page 10: ...se System 1 Remove the controller air blocker from the controller slot 2 Slide the new controller Figure 8 all the way into the base system Push the release lever towards the center of the controller...

Page 11: ...rvice Action Required LED Amber The seven segment display shows the sequence OS Sd blank to indicate that the controller is performing Start of day SOD processing After the controller successfully com...

Page 12: ...a about your updated storage array by using one of these methods Use the storage management software to collect and save a support bundle of your storage array From the Array Management Window select...

Reviews: